Pureablue is an integrated solution provider for public toilet and restroom solutions. Our expertise and experience in the architectural specification, design and construction of systems has been built upon since the company’s entry in to factory built toilet units in 1987 and is unparalleled.

During this time we have built and installed many toilet facility buildings around Australia and have a practical understanding of what it takes to deliver a solution that satisfies the key success factors of a public facility:

  • Cost effective construction techniques
  • High quality product to ensure maximum lifetime
  • Cost effective maintenance requirements

We have a vested interest in the performance of our facilities through its entire operational life well after construction is complete. Projects which do not operate successfully reflect badly on our brand and, the better our facilities perform the more likely we are to get future projects. We take pride in all of our work and only provide quality solutions.

We offer three main product and service offerings as detailed in the diagram below.

 
 
   
 
     
   
 
The construction philosophy of Pureablue is a focus on quality design and pre-fabrication style construction of steel and concrete components. Pre-fabrication allows for more manufacturing possibilities and also ensures high quality as work can be performed in factory conditions with specialized tools that are impractical and costly to transport to the construction site.
     By minimizing on-site work we can minimize unforeseen variables, such as bad weather, which can make projects run over time and over budget. Also, site costs such as barricading and risks of public injury are minimised.
 
 
 
       
  Our specialist team of architectural designers equipped with the latest 3D Cad tools work closely with our construction team to achieve designs that result in quality solutions and craftsmanship.   Our philosophy is to build as much of the project in our workshop as possible to achieve the greatest quality and efficiency. We always have the right tools on hand for the job, and have the right environment for the best craftsmanship.   The job is shipped as a ‘package’ of all required component ready for installation. Transport trucks are organised to arrive on site when the installation team has completed ground work and ready for the building.  
       
  Buildings and auxiliary structures are craned into position. Final trim components are added.   If applicable, water and sewerage services are connected. Facility is tested and cleaned ready for opening.   Final handover of fully complete operational facility including system management and maintenance guide.