Countrystyle CS1  
 
Countrystyle CS1 Construction Strategy
The focus on pre-fabrication construction allows for more manufacturing possibilities and also ensures high quality as work can be performed in factory conditions with specialized tools that are impractical and costly to transport to the construction site.
     By minimizing on-site work we can minimize unforeseen variables, such as bad weather, which can make projects run over time and over budget. Also, site costs such as barricading and risks of public injury are minimised.
 
 
Our specialist team of architectural designers equipped with the latest 3D Cad tools work closely with our construction team to achieve designs that result in quality solutions and craftsmanship.
Our philosophy is to build as much of the project in our workshop as possible to achieve the greatest quality and efficiency. We always have the right tools on hand for the job, and have the right environment for the best craftsmanship.
The job is shipped as a ‘package’ of all required component ready for installation. Transport trucks are organised to arrive on site when the installation team has completed ground work and ready for the building.
Buildings and auxiliary structures are craned into position. Final trim components are added.
If applicable, water and sewerage services are connected. Facility is tested and cleaned ready for opening.
Final handover of fully complete operational facility including system management and maintenance guide.
Click the link below to see a typical installation of a Countrystyle CS2 with a 10 000L CWT collection well waste system. On-site installation time ~ 1 - 1.5 days, break soil to commissioning and handover.