 |
Our specialist team of
architectural designers equipped with the latest 3D Cad
tools work closely with our construction team to achieve
designs that result in quality solutions and
craftsmanship. |
|
 |
Our philosophy is to build as much of
the project in our workshop as possible to achieve the
greatest quality and efficiency. We always have the
right tools on hand for the job, and have the right
environment for the best craftsmanship. |
|
 |
The job is shipped as a ‘package’ of all
required component ready for installation. Transport
trucks are organised to arrive on site when the
installation team has completed ground work and ready
for the building. |
|
 |
Buildings and auxiliary structures are
craned into position. Final trim components are added. |
|
 |
If applicable, water and sewerage
services are connected. Facility is tested and cleaned
ready for opening. |
|
 |
Final handover of fully complete
operational facility including system management and
maintenance guide. |
|