CAB2  
 
CAB2 Overview
A building with two AS1428.1 (2001) compliant disabled access booths. Constructed with our Conablue™ Stainless+Concrete™ Panel system (concrete pre-cast panel system with integral stainless steel internal lining), the building is suited for urban parks with sewer and water facilities as well as remote applications with a collection well or onsite treatment waste system configuration. Customisations include an enclosed plant room at the rear of the building to house cisterns, cleaning equipment and plumbing.