|
|
| |
|
 |
|
| Following are the 3 basic waste system configurations.
We will recommend the most suitable system for each project considering aspects such as services availability,
remoteness of location, environmental regulations, management and maintenance resources and
associated workplace health and safety responsibilities. |
|
Sewer-Septic |
 |
| For locations with full sewer and water services. |
 |
|
Collection Well |
 |
| Most recommended system
for non-serviced sites. AS1546.1 compliant.
All waste into collection well and then periodically transferred to municipal treatment plant.
Solves environmental, OH&S and vandalism issues.

|
 |
| On-site
Treatment System |
 |
| Not often recommended due to
environmental laws, maintenance workloads and OH&S
barriers. Generally constructed of vandalprone
roto-molded plastic, requires a concrete cellar
structure to house. Elevated floor requires access
ramps. |
 |
|
 |
| |
|
RELATED LINKS |
|
|
| |
| RELATED PRODUCTS |
|
|
| |
|